Pipe Extrusion Line

Browse by: All
  • Multi-layer HDPE Solid Wall Pipe Co-extrusion Line

    Multi-layer HDPE Solid Wall Pipe Co-extrusion Line

    According to the special needs of users, we can provide 2-layer / 3-layer / 5-layer and Multi-layer HDPE Solid Wall Pipe Co-extrusion Line.

    Port: Shanghai, China

    International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
    Terms of Payment: LC, T/T
    Certification: CE, ISO, UL, QS, GMP
    Warranty: 1 Year
    Average Lead Time: Peak season lead time: 3-6 months, Off season lead time: 1-3 months

  • Three-layer PVC Solid Wall Pipe Co-extrusion Production line

    Three-layer PVC Solid Wall Pipe Co-extrusion Production line

    The Three-layer PVC Solid Wall Pipe Co-extrusion Production line is used in the core layer foaming drain pipe with high barrier noise, the foaming core layer pipe with the spiral lines of inner wall with noise-reducing, and the good conductivity of the coal mine are used for three layers of PVC gas pipe.

    Port: Shanghai, China

    International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
    Terms of Payment: LC, T/T
    Certification: CE, ISO, UL, QS, GMP
    Warranty: 1 Year
    Average Lead Time: Peak season lead time: 3-6 months, Off season lead time: 1-3 months

  • Accessory equipment of pipe extrusion line

    Accessory equipment of pipe extrusion line

    Port: Shanghai, China

    International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
    Terms of Payment: LC, T/T
    Certification: CE, ISO, UL, QS, GMP
    Warranty: 1 Year
    Average Lead Time: Peak season lead time: 3-6 months, Off season lead time: 1-3 months

  • Other Special Pipe Production Line

    Other Special Pipe Production Line

    For different diameters and different production requirements, there are a variety of specifications and models of Pipe Production Line to choose from. JWELL machine has uniform plasticization and high output.

    Port: Shanghai, China

    International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
    Terms of Payment: LC, T/T
    Certification: CE, ISO, UL, QS, GMP
    Warranty: 1 Year
    Average Lead Time: Peak season lead time: 3-6 months, Off season lead time: 1-3 months

  • Small-caliber PE/PPR/PE-RT/PA Single-pipe, Dual-pipe High-speed Extrusion Production Line

    Small-caliber PE/PPR/PE-RT/PA Single-pipe, Dual-pipe High-speed Extrusion Production Line

    JWELL as China Plastic Extruder manufacturer, The main screw adopts BM high-efficiency type, and the output is fast and plasticized well. The wall thickness of pipe products is precisely controlled and very less waste of raw materials.

    Tubular extrusion special mold, water film high-speed sizing sleeve, equipped with integrated flow control valve with scale. Servo-controlled high-speed double-belt haul-off unit, supporting high-speed chipless cutter and winder, adapt to high-speed production operation.

    Port: Shanghai, China
    International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
    Terms of Payment: LC, T/T
    Certification: CE, ISO, UL, QS, GMP
    Warranty: 1 Year
    Average Lead Time: Peak season lead time: 3-6 months, Off season lead time: 1-3 months

  • PVC Dual pipe extrusion machine

    PVC Dual pipe extrusion machine

    Corresponding to the different requirements of pipe diameter and output, Jwell manufactures two types of SJZ80 and SJZ65 special twin-screw extruders optional; the dual pipe die evenly distributes the material output, and the pipe extrusion speed is quickly plasticized.

    Port: Shanghai, China

    International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
    Terms of Payment: LC, T/T
    Certification: CE, ISO, UL, QS, GMP
    Warranty: 1 Year
    Average Lead Time: Peak season lead time: 3-6 months, Off season lead time: 1-3 months

  • Large Diameter HDPE Solid Wall Pipe ExtrusionProduction Line

    Large Diameter HDPE Solid Wall Pipe ExtrusionProduction Line

    Performance & Advantages: Extruder is JWS-H series High efficiency, high output single screw extruder. The special screw barrel structure design ensures ideal melt uniformity at lower solution temperatures.

  • PE PP PVC Double wall corrugated pipe extrusion line

    PE PP PVC Double wall corrugated pipe extrusion line

    The corrugated pipe line is the 3rd generation of the improved product of Suzhou Jwell. The output of the extruder and the production speed of the pipe are greatly increased by 20-40% compared with the previous product. Online belling can be achieved to ensure the performance of the formed corrugated pipe products. Adopts Siemens HMI system.

    Port: Shanghai, China
    International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
    Terms of Payment: LC, T/T
    Certification: CE, ISO, UL, QS, GMP
    Warranty: 1 Year
    Average Lead Time: Peak season lead time: 3-6 months, Off season lead time: 1-3 months

  • PE Insulation Pipe Extrusion Line

    PE Insulation Pipe Extrusion Line

    This PE thermal insulation pipe machine featured with super large caliber 2 meters. Insulation material of PE outer protective tube is rigid polyurethane foam, density 60~80kg/m³.

    Port: Shanghai, China

    International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
    Terms of Payment: LC, T/T
    Certification: CE, ISO, UL, QS, GMP
    Warranty: 1 Year
    Average Lead Time: Peak season lead time: 3-6 months, Off season lead time: 1-3 months

  • RTP Reinforced Spiral Pipe Extrusion Line

    RTP Reinforced Spiral Pipe Extrusion Line

    RTP Reinforced Spiral Pipe Extrusion Line is mainly composed of inner tube extrusion and outer coating extrusion systems, multiple sets of winding machines, cooling setting devices, winders and control systems. The use of computerized centralized data control enables accurate control of the precise weight control of the inner tube, simultaneous traction control, automatic tube-lined coiling, and automatic multi-station precise layer control in the process.

    Port: Shanghai, China

    International Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
    Terms of Payment: LC, T/T
    Certification: CE, ISO, UL, QS, GMP
    Warranty: 1 Year
    Average Lead Time: Peak season lead time: 3-6 months, Off season lead time: 1-3 months